Case Study: Montefibre Acerra Italy

Location: Italy

Dismantling of PET plant by 40 workers. The project consists of 180 containers and 130 break-bulk loads.

Plant name:
Montefibre Acerra
Place of dismantling:
Acerra, Italy
Place of re-instalation:
Turkey Adana, Seyhan SASA Polyester
Duration:
March - September 2017

Some Interesting Facts:
Dismantling the entire PET installation. It was the second project in Italy for our Turkish customer.

Production lines:

1. CP3
2. Estrification
3. TPA
4. Boiler area
5. Cooling towers
6. SSP

Number and types of cranes:

Mobile cranes:
Cranes: 1x500T, 1x200T, 2x120T
Telescopic handlers x3
Forklifts x4 2,5T- 5T
Telescopic platform 1szt. 42H
Roto telehandler x 3

Number and types of other equipment used on the project:
Number of containers:
180 containers
130 break-bulks

Recent projects

Year Country Industry Description
2017 France/USA Chemistry & Rafineries Dismantling two carbon black bag filters
2017 France Chemistry & Rafineries Dismantling of primery bag filter for hard black carbon
2017 Poland Chemistry & Rafineries Dismantling of equipment in paharmacy factory

Contact us

If you need professional service
in dismantling and relocation of industrial plants,
please contact us.
We will reply you soon.

contact